The jack-up vessel JB-114 is due to be assisting with commissioning work on the Offshore Platforms in the Gwynt y Môr Offshore Windfarm, starting on 22nd April 2013.
A notice about these operations can be downloaded here and is summarised below.
JB-114 is due to arrive near the OSP East platform on 22nd April and will remain there for approximately 4 weeks. The JB-114 will then either relocate to the OSP West platform or remain on site as an installation drilling vessel.
When on location the JB-114 will require a 500m exclusion zone at all times. Vessels are also requested to give appropriate clearance when JB-114 is being towed to and from locations in the windfarm area.
The call sign for the JB-114 and also a link to information about the vessel is given below.
- JB-114: jack-up vessel | Call sign C6XJ9
The vessel will monitor VHF Channel 16 at all times.
Please contact Jim Andrews, Fishery Liaison Officer by e-mail or phone (+44(0)7908-225865) if you have any queries or concerns about this notice.