At the WHVDC information event in February we presented two possible landfall locations for the cable to come ashore on the North Wirral coast: Dove Point (Meols) and Leasowe.
These options have now been considered in detail and a landfall at Leasowe has been identified as the preferred option. The attached fact sheet describes how this decision was reached.
If you have any queries about this, please contact us.