WHVDC: Wirral Landfall

At the WHVDC information event in February we presented two possible landfall locations for the cable to come ashore on the North Wirral coast: Dove Point (Meols) and Leasowe.

These options have now been considered in detail and a landfall at Leasowe has been identified as the preferred option. The attached fact sheet describes how this decision was reached.

If you have any queries about this, please contact us.

This entry was posted in AWJ Updates, Fishery Liaison, Western High Voltage DC Link, Western Link Undersea Cable and tagged , , , . Bookmark the permalink.