Awel y Môr Proposed Wind Farm Update: Newsletter, February 2024

The February 2024 newsletter for the Awel y Môr windfarm is available from the Awel y Môr website here. It provides an update on the preparatory work that is underway on land and at sea to get ready for construction work to begin in 2025.  A brief summary of the key information relevant to mariners is provided below.

Offshore Site Investigations: Ongoing

At the end of November 2023 the Seafox 7 jack-up barge departed Holyhead to start offshore site investigations.  The barge has been taking borehole samples from the seabed to provide the project team with a detailed understanding of the geology of the proposed array area. The stormy weather over the winter has slowed progress, and this survey work is now due to be completed in May 2024.

A Notice to Mariners was issued at the end of October 2023, and is summarised here.  Information about the Seafox 7 and its support vessels are provided below, including a link to its present location on the MarineTraffic website:-

  • Seafox 7: drilling vessel | MMSI 235065812 | Call sign 2BGC6
  • Elisa: Support vessel / tug | MMSI 236745000 | Call sign PBZP
  • Fairplay 32: Support vessel / tug | MMSI 210447000 | Call sign 5BAM6
  • MCS Boreas: Crew Transfer Vessel | MMSI 235096501 | Call sign 2GDR8

Operations will be conducted on a 24 hour basis.  A continuous listening watch will be conducted on VHF Channel 16.

Other vessels are requested to keep their distance, maintaining at least a 500m distance.

About the proposed windfarm

The Awel y Môr Offshore Wind Farm would be built around six miles off the North Wales coast, to the west of the existing Gwynt y Môr windfarm.  Awel y Môr would be connected to the National Grid by an export cable coming ashore between Rhyl and Prestatyn.  The proposed windfarm would include up to 50 wind turbines.  It could generate enough power for up to half a million homes, and it will be the largest renewable energy investment in Wales in this decade. Full project details and maps of the windfarm location are available at the project website awelymor.cymru.

This entry was posted in Awel y Mor Offshore Wind Farm, AWJ Updates, Fishery Liaison and tagged , , , , , , . Bookmark the permalink.