This is a summary of the weekly notice of operations for the Gwynt y Môr Offshore Windfarm issued on 27th January 2014 to harbour masters and sea users. This notice describes progress with construction, recent operations, work planned for the next 7 days, and provides a list of vessels operating on the site with their contact details.
Wind Farm Construction Status
Progress with construction is illustrated in a map here, and summarised below:-
- Monopiles: 160 installed. Monopile installation is complete.
- Transition pieces: 152 installed, 8 remaining.
- Export cables: 4 export cables installed; installation is complete.
- Array cables: 38 array cables installed, 123 remaining.
- Wind Turbine Generators: 115 installed, 45 remaining.
Navigation Hazards
There are presently a number of navigation hazards in and around the windfarm area. These include:-
- Unlit objects – there is presently 1 unlit transition piece within the windfarm boundary. The location of this hazard is shown in a map here.
- Exposed monopiles – there are currently 8 exposed monopiles, which may be submerged at certain states of tide. Extreme care should be observed in the vicinity of these monopiles. Advice about exposed monopiles is given in our previous notice here.
The location of these hazards is shown in a map here.
Work carried out over past 7 days
The following work has been carried out in the past week:
- Friederich Ernestine is at Gwynt y Môr wind farm continuing foundation installation.
- Wind Solution has remained at anchor position south of Gwynt y Môr (see our previous notice here).
- Penrhyn Bay, Caernarfon Bay, Abersoch Bay, Gaillion, Gardian 10, Gardian, Colwyn Bay, Scirocco, Porth Dinllaen, Porth Diana, EMS Viking and Endurance utilised as Crew Transfer Vessels when required sailing from Canada Dock 3.
- Penrhos Bay & Tremadoc Bay are on 24 hour cover and being utilised by the Emergency Rescue Team sailing from RWE Pontoon Birkenhead.
- Chinook utilised as Crew Transfer / Stand by vessel as required and based at Liverpool Marina.
- Athenia, Adventure, Endeavour, Buzzard, Captain P, Commodore P, Porth Wen, Iceni Victory and Discovery CTVs sailed from Mostyn as required.
- Isadale performed guard duties and was used as the Marine Mammal Observation vessel.
- Normand Tonjer has continued diving operations assisting Polar Prince as required.
- Pamela P has been carrying out diving operations at various turbine locations (see the Notice to Mariners here).
- Polar Prince and Polar King continued array cable installation assisted by CTVs Rix Panther and Rix Tiger (see our previous notice here)..
- Sea Jack and Sea Worker continued turbine installation, assisted by Sea Golf, Sea Bravo, Sea Echo & Bever (see our previous notice here).
- JB114 continued drilling operations in Gwynt y Môr windfarm assisted by Smit Barracuda and Union Diamond.
- Channel Chieftain VII and Cwind Challenger continued refuelling operations on site based from Mostyn.
- Cable vessel Sia remained alongside in CLD wet basin.
- Siemens SWATH (Small Water Area Twin Hull) CTVs Sea Breeze and Sea Storm continued mobilisation at Liverpool
- HBC Supporter, MCS Zephyr, Achiever, Transporter and Fugro Saltire arrived at Liverpool to mobilise for the project.
Work planned for next 7 days
The work planned for the next 7 days on the site is:
- Friederich Ernestine and support vessels will continue with foundation installation.
- Wind Solution will remain at anchor position to the south of Gwynt y Môr (see our previous notice here).
- Sea Jack and Sea Worker turbine installation vessels will continue with wind turbine installation (see our previous notice here).
- Penrhyn Bay, Caernarfon Bay, Abersoch Bay, Gaillion, Gardian 10, Gardian, Colwyn Bay, Scirocco, Porth Dinllaen, Porth Diana, EMS Viking and Endurance will be utilised as Crew Transfer Vessels when required sailing from Liverpool Marina and Canada Dock 3.
- Penrhos Bay & Tremadoc Bay will provide 24 hour Emergency Rescue Team cover.
- Athenia, Adventure, Endeavour, Buzzard, Captain P, Commodore P, Porth Wen, Iceni Victory and Discovery CTVs are sailing from Mostyn.
- Normand Tonjer will continue diving operations including work with the Polar Prince to aid installation of array cables.
- Pamela P will continue diving operations at various turbine locations (see our previous notice here).
- Isadale will continue performing guard duties and will be used as the Marine Mammal Observation vessel as and when required.
- JB114 will continue with drilling operations at Gwynt y Môr wind farm supported by Smit Barracuda and Union Diamond.
- Channel Chieftain VII and Cwind Challenger will continue refuelling operations on site based from Mostyn.
- Cable vessel Sia and HBC Supporter will commence operations at site.
- Polar Prince will continue array cable installation with Polar King (see notice to mariners here) assisted by CTVs Rix Panther and Rix Tiger.
- Sea Breeze and Sea Storm will commence operations at site.
- MCS Zephyr, Achiever and Transporter and Fugro Saltire will continue mobilisation in Liverpool, commencing work at the site this week.
List of vessels at site for next 7 days
The vessels that will be operating on the site over the next 7 days and their contact details are given below. We have linked up the vessel names to MarineTraffic.com so that with just one mouse click you can find out more about their current location and recent activity.
- Abersoch Bay: Crew transfer vessel | Call sign 2FDG3
- Adventure: Crew transfer vessel | Call sign 2GGG9
- Achiever: Crew Transfer Vessel | Call sign OZFS2
- Athenia: Crew transfer vessel | Call sign 2EuE2
- Buzzard: Crew transfer vessel | Call sign 2GAX3
- Captain P: Crew transfer vessel | Call sign 2FSO5
- Caernarfon Bay: Crew transfer vessel | Call sign 2FHG7
- Channel Chieftain VII: Work vessel | Call sign 2GAO6
- Chinook: Crew transfer vessel | Call sign 2FFH2
- Colwyn Bay: Crew transfer vessel | Call sign 2CYE6
- Commodore P: Crew transfer vessel | Call sign 2GIR2
- Cwind Challenger: High Speed Craft | Call sign 2GRU4
- Discovery: Crew transfer vessel | Call sign 2GEQ9
- EMS Viking: Crew transfer vessel | Call sign 2EKH5
- Endeavour: Crew transfer vessel | Call sign 2GET2
- Endurance: Crew transfer vessel | Call sign 2CUN7
- Friederich Ernestine: multi purpose offshore vessel | Call sign DIPC2
- Fugro Saltire: Offshore Supply Vessel | Call sign LHOD
- Gaillion: Crew Transfer vessel | Call sign 2EON7
- Gardian: Crew Transfer vessel | Call sign 2DMP7
- Gardian 10: Crew Transfer vessel | Call sign 2FSC9
- HBC Supporter: Diving support vessel | Call sign V3NA4
- Iceni Victory: Crew Transfer vessel | Call sign 2GUG2
- Isadale: Guard vessel | Call sign GPIV
- JB-114: jack-up vessel | Call sign C6XJ9
- Line: Research / survey vessel | Call sign OWHJ2
- MCS Zephyr: Crew Transfer Vessel | Call sign 2EIS5
- Normand Tonjer: Multi purpose offshore vessel | Call sign 2BEC9
- Penrhos Bay: Crew transfer vessel | Call sign 2DLB8
- Penrhyn Bay: Crew transfer vessel | Call sign 2EBK5
- Polar King: Diving support vessel | Call sign 5BDF3
- Polar Prince: Offshore supply ship | Call sign LALX5
- Porth Diana: Crew transfer vessel | Call sign 2EMJ2
- Porth Dinllaen: Crew transfer vessel | Call sign 2EGV2
- Porth Wen: Crew transfer vessel | Call sign 2FAR8
- Rix Panther: Crew transfer vessel | Call sign 2FRT9
- Rix Tiger: Crew transfer vessel | Call sign 2GGY4
- Scirocco: Crew transfer vessel | Call sign 2FDR4
- Sea Breeze: crew transfer vessel | Call sign OUWS2
- Sea Bravo: Tug | Call sign PHSP
- Sea Echo: Tug | Call sign PHLP
- Sea Golf: Tug | Call sign PBSS
- Sea Jack: support jack up | Call sign OXKRZ
- Sea Storm: Crew transfer vessel | Call sign OUWZ2
- Sea Worker: support jack | Call sign OYRN2
- Sia: cable laying vessel | Call sign OWFI2
- Smit Barracuda: tug | Call sign PHFW
- Supporter: Crew Transfer Vessel | Call sign OXNM2
- Transporter: Crew Transfer Vessel | Call sign OUTB2
- Tremadoc Bay: Crew transfer vessel | Call sign 2FHG8
- Union Diamond: Tug | Call sign ORLK
- Wind Solution: Accommodation vessel | Call sign 2ARO7
- Zephyr: Crew Transfer Vessel | Call sign 2EIS5
All vessels will monitor VHF Channel 16.
Port Arrivals
The planned port arrivals over the next 7 days are:-
- Cammel Laird Birkenhead/Port of Liverpool.
- Construction vessels and support vessels may enter Liverpool at short notice to change crew and collect stores.
- Mostyn.
- Seatruck Pace will be arriving & departing on a regular basis delivering turbine components.
- Sea Jack and Sea Worker turbine installation vessels will be arriving & departing on a regular basis to collect turbine components.
- Crew transfer vessels listed in this notice will be transiting on a daily basis.
- Scirocco in Mostyn on Tuesdays and Wednesdays for Sea Jack and Sea Worker crew changes.
- Channel Chieftain VII & Cwind Challenger transiting daily, operating 24 hours.
- Liverpool marina / Cammell Lairds wet basin / Canada Dock
- Crew transfer vessels listed in this notice will be transiting on a daily basis.
- Fleetwood
- Guard vessel Isadale bunkering fuel when required in Fleetwood.
Please contact Jim Andrews, Fishery Liaison Officer by e-mail or phone (+44(0)7908-225865) if you have any queries or concerns about these activities.